1.0constructconnect.comBC Hydro to build $1 billion in Fraser Valley electrical infrastructurerich600338<blockquote class="wp-embedded-content" data-secret="lLPELsOh2E"><a href="/joc/news/infrastructure/2024/09/bc-hydro-to-build-1-billion-in-fraser-valley-electrical-infrastructure">BC Hydro to build $1 billion in Fraser Valley electrical infrastructure</a></blockquote><iframe sandbox="allow-scripts" security="restricted" src="/joc/news/infrastructure/2024/09/bc-hydro-to-build-1-billion-in-fraser-valley-electrical-infrastructure/embed#?secret=lLPELsOh2E" width="600" height="338" title="“BC Hydro to build $1 billion in Fraser Valley electrical infrastructure” — constructconnect.com" data-secret="lLPELsOh2E" frameborder="0" marginwidth="0" marginheight="0" scrolling="no" class="wp-embedded-content"></iframe><script type="text/javascript"> /*! This file is auto-generated */ !function(c,d){"use strict";var e=!1,o=!1;if(d.querySelector)if(c.addEventListener)e=!0;if(c.wp=c.wp||{},!c.wp.receiveEmbedMessage)if(c.wp.receiveEmbedMessage=function(e){var t=e.data;if(t)if(t.secret||t.message||t.value)if(!/[^a-zA-Z0-9]/.test(t.secret)){for(var r,a,i,s=d.querySelectorAll('iframe[data-secret="'+t.secret+'"]'),n=d.querySelectorAll('blockquote[data-secret="'+t.secret+'"]'),o=0;o<n.length;o++)n[o].style.display="none";for(o=0;o<s.length;o++)if(r=s[o],e.source===r.contentWindow){if(r.removeAttribute("style"),"height"===t.message){if(1e3<(i=parseInt(t.value,10)))i=1e3;else if(~~i<200)i=200;r.height=i}if("link"===t.message)if(a=d.createElement("a"),i=d.createElement("a"),a.href=r.getAttribute("src"),i.href=t.value,i.host===a.host)if(d.activeElement===r)c.top.location.href=t.value}}},e)c.addEventListener("message",c.wp.receiveEmbedMessage,!1),d.addEventListener("DOMContentLoaded",t,!1),c.addEventListener("load",t,!1);function t(){if(!o){o=!0;for(var e,t,r,a=-1!==navigator.appVersion.indexOf("MSIE 10"),i=!!navigator.userAgent.match(/Trident.*rv:11\./),s=d.querySelectorAll("iframe.wp-embedded-content"),n=0;n<s.length;n++){if(!(r=(t=s[n]).getAttribute("data-secret")))r=Math.random().toString(36).substr(2,10),t.src+="#?secret="+r,t.setAttribute("data-secret",r);if(a||i)(e=t.cloneNode(!0)).removeAttribute("security"),t.parentNode.replaceChild(e,t);t.contentWindow.postMessage({message:"ready",secret:r},"*")}}}}(window,document); </script> https://cc-production-uploads-bucket.s3.amazonaws.com/uploads/2023/09/DCNGEN-resource-mainweb-maggie.jpg1024576CHILLIWACK, B.C. – BC Hydro will build approximately $1 billion in capital projects in in Chilliwack, Abbotsford, Mission, Hope and Harrison Hot Springs over the next decade, the government of British Columbia announced Aug 28. The province announced BC Hydro’s updated 10-year capital plan in January with $36 billion in regional and community infrastructure investments […]